The dry mortar equipment is of the type of installation and use, but it needs a running-in period when it is purchased, which is similar to that when it is purchased, and these problems always occur when the new equipment is just put into use.
1、 Fixation of the machine
When the equipment of large enterprises can be installed, the manufacturer of dry mortar equipment generally sends one or two instructors to let the buyer find some construction workers to work in the local area to install the system. Therefore, for some laymen, it is likely that they are careless because they need to be familiar with it. Therefore, it is necessary to pay attention to whether the equipment screws are loose when the new machine is running.
2、 Pay attention to the site environment
For example, in a nearby project, the on-site operators did not release the water in the air compressor in time, resulting in the non-discharge of packaging equipment and delayed production. It is generally recommended to put it once or several times a day, depending on the specific production situation and site environment.
3、 Unloading start
Whether it is small or medium-sized equipment or large equipment, if the power is suddenly cut off during the production process and the material is restarted, the mixer cannot be started and needs to start unloading.